Posts

Showing posts with the label Flood Risk

Climate Change: managing flood risk, water quality and tidal energy: letter from Marg Coles to Angela Eagle MP

Image
  Docks along the Mersey    My friend Marg has sent the letter below to her M.P. and whilst it it refers to the River Mersey, the names within our river catchment could just as easily be substituted (Thames, Hogsmill, Wandle, Queens Promenade, Teddington Lock etc.). Lack of preparation and rising water levels in the Thames, are becoming an increasingly urgent concern, yet preparation has lagged behind the pace of change. More frequent and intense rainfall, higher tides, and climate-driven sea-level rise are putting additional pressure on aging flood-defence systems.  “From 2035, sea level rise and changes to the Thames Barrier operation will result in higher water levels in the River Thames. In areas between Richmond and Sunbury, these increases could range from over one metre to as little as a few centimetres during frequent flood events that we expect to see most winters. Sea level rise will progressively increase flood levels in West London throughout the rest of ...

Local Rivers Day

Image
Local Rivers Day was held at KEC on Saturday 24th September. Amongst the displays were The Environment Agency on local flood alleviation plans, the Hogmsill Community Garden, the Hogsmill river project, and the London Waterkeeper-Theo Thomas- who campaigns for clean and thriving rivers in parks, including swimming zones created along the our non-tidal stretch section of the Thames, as well as helping to monitor the Hogsmill.  There was also a magnetic fishing pond complete with mini supermarket trolley created by Danielle O'Shaughnessy for the children.

Flood Risk Position Statement

Image
http://www.britainfromabove.org.uk  Left: the River Hogsmill in flood between Rose Walk and Green Lane Recreation Ground, Berrylands, 1937. This image has been reproduced with permission from the website Britain from Above A group of us recently came together to talk about the risks of flooding in the borough of Kingston. We have identified a mismatch between the intervention required to mitigate flood risks and practice; particularly where new developments in Flood Zone 3 are concerned. There is also concern about loss of soft verges, and trees and an increase in urban density.  Hogsmill improvements Tolworth 2015 Hogsmill improvements, Knights Park, Further landscape interventions are required to slow, store and filter water; reforestation; wetland creation and re-meandering of river catchments; serving to alleviate floods and droughts; slowing the surface water run - off, allowing it to filter and store, recharging aquifers, and creating ...